Prepped multiple level roof sections and removed wind screens
Installed Duro-Last TPO membrane to multiple level roof sections, re-set wind screens, and installed new edge detail
Slide title
Write your caption here
Button
Slide title
Write your caption here
Button
Slide title
Write your caption here
Button
St. Peter’s Lutheran Church
Insurance Claim Restoration Project ‒ Wind, Hail
Removed damaged siding, fascia/soffit, and window/door custom aluminum wraps
Removed bell tower siding and fascia/soffit system
Installed new insulated siding panels, custom bent aluminum fascia/soffit and specialty custom radius for window/door trim wraps
Installed custom bent fascia/soffit system on bell tower
Removed asphalt shingles from all pitched roofs and steeple
Installed new architectural laminated shingles to roof surfaces
Re-fastened all 1x4 decking to rafters on steeple and installed new architectural laminated shingles (Note: all shingles on the steeple had to be installed with 6 nails per shingle and every shingle had to be fiber roof cemented down due to steepness and high wind area to hold warranty)
Installed decorative cap to all hips of the steeple going up the full length of the roof
Slide title
Write your caption here
Button
Slide title
Write your caption here
Button
Slide title
Write your caption here
Button
Slide title
Write your caption here
Button
Slide title
Write your caption here
Button
Slide title
Write your caption here
Button
Slide title
Write your caption here
Button
Slide title
Write your caption here
Button
Slide title
Write your caption here
Button
Slide title
Write your caption here
Button
St. Peter’s Lutheran Church
Insurance Claim Restoration Project ‒ Wind, Hail
Removed damaged siding, fascia/soffit, and window/door custom aluminum wraps
Removed bell tower siding and fascia/soffit system
Installed new insulated siding panels, custom bent aluminum fascia/soffit and specialty custom radius for window/door trim wraps
Installed custom bent fascia/soffit system on bell tower
Removed asphalt shingles from all pitched roofs and steeple
Installed new architectural laminated shingles to roof surfaces
Re-fastened all 1x4 decking to rafters on steeple and installed new architectural laminated shingles (Note: all shingles on the steeple had to be installed with 6 nails per shingle and every shingle had to be fiber roof cemented down due to steepness and high wind area to hold warranty)
Installed decorative cap to all hips of the steeple going up the full length of the roof
Removed and repaired copper metal dormers, copper gutters, and chimneys
Repaired structural damage to top flat deck surface
Installed Poly-ISO insulation and Duro-Last TPO membrane system to the top flat deck surface of the building
Removed existing shingles and Installed custom bent copper flashings for the edge details and valleys
Built custom copper cone caps and custom cut ridge cap to fit
Installed 3/8" Vermont slate to the entire pitched roof surface (Note: each piece of slate was fastened with two (2) stainless steel fasteners to roof deck
Removed and repaired copper metal dormers, copper gutters, and chimneys
Repaired structural damage to top flat deck surface
Installed Poly-ISO insulation and Duro-Last TPO membrane system to the top flat deck surface of the building
Removed existing shingles and Installed custom bent copper flashings for the edge details and valleys
Built custom copper cone caps and custom cut ridge cap to fit
Installed 3/8" Vermont slate to the entire pitched roof surface (Note: each piece of slate was fastened with two (2) stainless steel fasteners to roof deck
Content, including images, displayed on this website is protected by copyright laws. Downloading, republication, retransmission or reproduction of content on this website is strictly prohibited. Terms of Use
| Privacy Policy