WE START WITH HIGHER REFLECTIVITY
- AND MAINTAIN IT LONG-TERM.
The superior, long-lasting reflectivity of a Duro-Last Cool Zone roofing system starts with proprietary thermoplastic PVC film, Our formulation produces a membrane that is white through and through, to provide the longest lasting high reflectivity of any single-ply membrane.
In fact, a Duro-Last Cool Zone roofing system loses only 1% of reflectivity after three years of weathering.
This high, sustained reflectivity is saving significant energy and money for building owners all over the U.S.
PRODUCT
DESCRIPTION
The Duro-Last membrane is classified as a co-polymer alloy and is a proprietary thermoplastic formulation consisting of resins and plasticizers, stabilizers, biocides, flame retardants and U.V. absorbents. This membrane is then laminated to a weft insertion knitted scrim. The Duro-Last membrane is available in white, tan or gray.
A CUSTOM
PREFABRICATED SYSTEM
Duro-Last uses custom prefabrication to provide quality-assured products by producing 80-85% of the seaming in a controlled environment. The architect, specifier, consultant, contractor, building owner and the manufacturer have peace-of-mind knowing that only 15-20% of the seaming is done in the field.
Every project is pre-engineered and designed to address the specific needs of each individual roofing application. Prefabrication reduces material waste associated with roll goods systems.
Additionally, the Duro-Last (white) membrane can reflect up to 86% of the sun's ultraviolet rays. This in turn, can save money on energy costs.
ACCESSORIES
Duro-Last produces a complete line of standard and custom prefabricated accessories. These accessories incorporate the same membrane as the roofing sheets, and are made in the factory rather than labor intensive field fabrication on the roof.
Standard accessories include:round pipe flashings, inside and outside corners, 2-way roof vents, roof drain filters, drip edges, gravel stops, termination bars and fascia with covers and clips.
Custom accessories include: large, round pipe flashings, parepet wall flashings, scuppers and flashings for all types of roof penetrations. (Example: HVAC units, skylights, chimneys, etc...)
A PERFECT
MATCH
After Duro-Last roof sections and accessories are installed, the completed roof becomes one integrated system. Like a finely engineered machine, the Duro-Last Roofing System components work together to provide long-term watertight performance and protection.
A HEAT WELDED
SYSTEM
Hot air welding is used to bond all of Duro-Last's field seams, The welds can be made with either a hand-held unit or a walker welder. Heat welding eliminates the need for chemicals, torches and other unsafe non-manageable seaming systems. Duro-Last's product properties combined with heat seaming create a bond that is stronger than the individual products alone.
VERY LOW
MAINTENANCE
The Duro-Last Roofing System is non-curing to provide excellent welding ability for the entire life of the system. A patch, curb, stack or any other necessary alterations can easily be accomplished by heat welding the new Duro-Last membrane or accessory to the existing membrane. Once installed, the Duro-Last Roofing System is continually watertight and virtually maintenance-free.
EASY
INSTALLATION
The Duro-Last Roofing System is quick and easy to install. This roofing system can be installed by an authorized contractor right over most new or exciting substrates. The need for costly tear-offs and disposal can oftentimes be eliminated. Slipsheets are required in some re-roofing applications. Most insulations have been approved for use with the Duro-Last Roofing System.